Key takeaways
-
Start with the business problem, not the platform. Pick three to five measurable goals first, such as faster approvals or one governed home for policies. Every later decision is judged against them.
-
Structure comes before design. Information architecture, metadata and governance decide whether SharePoint feels organised or chaotic, so plan them before building anything.
-
Configure first, automate with low-code, write code last. Built-in features and Power Apps cover a lot. Use SPFx and .NET only where they add real value.
-
SharePoint Online is the practical default. SharePoint Server 2016 and 2019 lost Microsoft support in July 2026, so teams on those versions should plan an upgrade or a move to the cloud.
-
Budget two things: licences and the build. Microsoft 365 licensing starts around USD 7(₹670)per user per month. (₹2.9 lakh) for a basic team site to US$100,000+ (₹96 lakh+) for an enterprise portal with integrations.
-
Timelines run from 3 weeks to 9 months. Scope, integrations and the quality of your existing content are the biggest drivers.
-
Test permissions and security before launch. One sharing mistake can expose sensitive files, so give testing real time.
-
Adoption decides the return. Plan training, department champions and a support budget of roughly 15 to 20% of build cost per year.
-
Tidy your content before adding AI. Copilot and custom AI tools are only as useful as the documents and permissions behind them.
Related Nextwebi pages: SharePoint customization · SharePoint platform · Custom portal development · Hire SharePoint developers · AI development and integration
What is SharePoint solution development?
SharePoint is Microsoft's platform for intranets, team sites, document management and business workflows. Out of the box it is a capable file and collaboration tool. Solution development is what turns it into your system: a branded intranet people actually open, a document library with the right approvals, a leave-request flow that replaces email chains, a portal that pulls live data from your ERP.
The work usually combines four layers:
-
Configuration: sites, hubs, libraries, content types, metadata and permissions.
-
Custom development: SharePoint Framework (SPFx) web parts, .NET back ends, Azure Functions and APIs.
-
Low-code automation: Power Apps and Power Automate for forms and approvals.
-
Integration and migration: connecting ERP, CRM, HRMS and moving content from legacy systems.
One point worth knowing before you plan: SharePoint comes in two flavours. SharePoint Online lives inside Microsoft 365 and is where Microsoft is investing. SharePoint Server runs on your own infrastructure. Microsoft's support for SharePoint Server 2016 and 2019 ended in July 2026, so teams still on those versions should be planning an upgrade or a move to the cloud now.
Nextwebi has delivered SharePoint work across SharePoint 2007, 2013, 2016, 2019 and SharePoint Online. Explore our Microsoft SharePoint customization and development services or the SharePoint platform page.
Why businesses invest in custom SharePoint solutions
-
One source of truth. Policies, contracts and project files live in one governed place, not scattered across inboxes and shared drives.
-
Faster approvals. Workflows route requests automatically and leave an audit trail.
-
Better internal communication. A proper intranet gives news, directories and tools a single front door.
-
Security you can prove. Role-based access, versioning, retention and sensitivity labels support audits and compliance.
-
Lower tool sprawl. If you already pay for Microsoft 365, SharePoint is included in your licence, so you build on what you own.
-
Room to grow. Add integrations, dashboards and AI features later without replatforming.
Before you build: out of the box, customised or fully custom?
Many teams do not need a big build. Decide where you sit on this spectrum first.
|
Option |
Best for |
Strengths |
Weaknesses |
|
Out-of-the-box SharePoint |
Standard collaboration and small teams |
Included in your Microsoft 365 licence, fast to start |
Generic structure, limited fit for your processes |
|
Customised SharePoint (configuration, SPFx, Power Platform) |
Teams already on Microsoft 365 with specific processes |
Builds on the licence you own, works with Teams and Entra ID |
Needs governance and a capable build partner |
|
Fully custom portal or intranet |
Unusual workflows, non-Microsoft stack, many external users |
Exact fit, you control the roadmap and the data |
Higher build and maintenance effort, no native Microsoft 365 integration |
|
Hybrid |
Teams that want both |
SharePoint for documents and collaboration, a custom portal for specialised workflows |
More integration work |
If a standalone portal fits better than SharePoint, see our custom portal development service.
Types of SharePoint solutions and typical timelines
|
Solution type |
What it does |
Best for |
Typical timeline |
|
Team and communication sites |
Shared workspaces, announcements, project hubs |
Small teams, quick wins |
3 to 6 weeks |
|
Intranet portal |
Branded home, news, directory, quick links, search |
Mid-size and large organisations |
8 to 14 weeks |
|
Document management system |
Metadata, versioning, check-in/out, retention, approvals |
Regulated or document-heavy teams |
8 to 14 weeks |
|
Workflow and forms automation |
Power Apps and Power Automate for requests, leave, onboarding |
Teams drowning in email approvals |
3 to 10 weeks |
|
Extranet and partner portal |
Secure external sharing with vendors and clients |
Distributors, agencies, franchises |
8 to 16 weeks |
|
Enterprise portal with integrations |
HRMS, helpdesk, ERP/CRM data, dashboards in one place |
Large enterprises |
4 to 9 months |
|
Migration and modernisation |
Move from file shares or older SharePoint to SharePoint Online |
Anyone on legacy versions |
3 to 12 weeks |
SharePoint solutions by level: Basic, Medium, Advanced and Enterprise
Pick the level that matches your team size, your systems and how much automation you need on day one. A modular build lets you move up over time.
|
Aspect |
Basic |
Medium |
Advanced |
Enterprise |
|
Goal |
Replace shared drives and email attachments |
Launch a branded intranet and automate approvals |
Connect business systems and add analytics |
Run many departments, regions and partners on one governed platform |
|
Typical scope |
Team and communication sites, document libraries |
Intranet, document management, Power Apps forms |
Custom SPFx web parts, ERP, CRM and HRMS integrations, dashboards |
Multi-site architecture, extranet, advanced governance, AI search or agents |
|
Automation |
Basic alerts and approvals |
Power Automate workflows |
Cross-system workflows |
Workflows with SLAs and escalation |
|
Integrations |
Microsoft 365 and Teams |
Teams, Outlook and a few connectors |
ERP, CRM, HRMS, Entra ID single sign-on |
APIs, data warehouse, partner systems |
|
Governance and security |
Standard permissions |
Permission model and retention rules |
Sensitivity labels and audit trails |
Full compliance, data loss prevention, security reviews |
|
Typical timeline |
3 to 6 weeks |
8 to 14 weeks |
3 to 5 months |
5 to 9 months |
|
Typical cost |
US3,000toUS8,000 (₹2.9 to ₹7.7 lakh) |
US10,000toUS30,000 (₹9.6 to ₹28.8 lakh) |
US30,000toUS60,000 (₹28.8 to ₹57.6 lakh) |
US60,000toUS100,000+ (₹57.6 to ₹96 lakh+) |
These are typical project ranges. Section 6 breaks down licensing and development cost in more detail.
The step-by-step SharePoint development process
Here is the process we follow at Nextwebi. It mirrors our standard delivery model of scoping, cost estimation, development, QA, deployment and maintenance, adapted for SharePoint.
Step 1: Define goals and success metrics
Start with the business problem, not the platform. Are you cutting approval time, replacing an ageing intranet, preparing for an audit? Pick three to five measurable targets (for example, "leave approvals under 24 hours" or "90% of policy documents in one library"). Everything later is judged against these.
Deliverables: goals document, stakeholder list, success metrics.
Step 2: Audit your current environment and content
Inventory what you have: existing sites, file shares, SharePoint version, customisations, integrations, user counts and data volume. Flag duplicate, outdated and sensitive content early. This audit decides your migration scope and removes surprises from the budget.
Deliverables: content inventory, risk and dependency list, migration scope.
Step 3: Choose the right deployment model
|
Model |
Choose it when |
Watch out for |
|
SharePoint Online (Microsoft 365) |
You want faster rollout, automatic updates, Teams and Copilot integration |
Per-user licensing; tenant limits and governance setup |
|
SharePoint Server (on-premises) |
Strict data residency or air-gapped requirements |
You own patching, hardware and upgrades |
|
Hybrid |
Part of your content must stay on-premises |
More complexity in identity and search |
For most new projects, SharePoint Online is the practical default. If you need an on-premises build, see our on-premise app development service, and for cloud planning our cloud consulting and Azure cloud services.
Step 4: Plan information architecture and governance
This is the step that quietly decides whether your SharePoint feels organised or chaotic. Decide the hub and site structure, navigation, content types, metadata, naming rules and permission groups. Set governance rules up front: who creates sites, who owns content, how long records are kept, how external sharing is approved.
Deliverables: site map, metadata model, permission matrix, governance policy.
The hub carries shared navigation, search and branding, while each department keeps its own site, owners and permissions.
Step 5: Design the experience and prototype
Good SharePoint design is about findability: the right thing in two clicks, on desktop and mobile. We start with application wireframing, then move to UI/UX design that matches your brand, and test the prototype with a few real users before any build begins.
Deliverables: wireframes, visual design, clickable prototype, user feedback notes.
Step 6: Build and configure
Build in this order: configure what SharePoint already does well, automate with low-code where it fits, and write custom code only where it genuinely adds value.
-
Configuration first: libraries, views, content types, search and permissions.
-
Power Apps and Power Automate for forms, approvals and notifications.
-
SPFx web parts (using React and TypeScript) for custom interfaces. See our React development expertise.
-
.NET and Azure Functions for heavier back-end logic. See ASP.NET and .NET Core development.
Sprint-based delivery with demos every one to two weeks keeps stakeholders involved and avoids a big-bang surprise at the end.
Step 7: Integrate with your business systems
SharePoint becomes far more valuable when it talks to the tools your teams already use: ERP, CRM, HRMS, Microsoft Dynamics, Exchange, Teams, Entra ID (Azure AD) single sign-on and third-party apps. We build these through secure APIs. Related services: ERP application development, CRM application development and custom API development.
Step 8: Secure, test and fix
Test three things: does it work (functional and user acceptance testing), does it hold up (performance with real data volumes), and is it safe (permissions, external sharing, vulnerabilities). A permissions mistake in SharePoint can expose sensitive files to the wrong people, so this step deserves real time.
Step 9: Migrate content
Move content in waves, not all at once. Clean first, map old metadata to the new model, run a pilot batch, validate, then migrate the rest with a short freeze window. We have migrated content from file shares and legacy platforms into SharePoint with minimal user disruption. Learn more about our application migration and re-engineering and cloud migration and integration services.
Step 10: Launch, train and drive adoption
A solution nobody uses is wasted money. Plan a pilot group, role-based training, short how-to guides and champions inside each department. Announce the launch on the new intranet itself so people have a reason to visit.
Step 11: Support and keep improving
After go-live, monitor usage and performance, patch and update, and review governance every quarter. Most teams add features in phase two once real usage shows what matters. Our maintenance and support team handles this, and you can also hire dedicated SharePoint developers.
Each step is explained above; the phases show where the work shifts from planning to building, proving and launching.
Technology stack for SharePoint development
|
Layer |
Common technologies |
|
Platform |
SharePoint Online, SharePoint Subscription Edition, Microsoft 365, Teams |
|
Front end |
SPFx, React, TypeScript, HTML5, CSS3 |
|
Low-code |
Power Apps, Power Automate, Power BI |
|
Back end |
.NET and .NET Core, C#, Azure Functions, REST and Graph APIs |
|
Data |
SQL Server, Azure SQL, Dataverse |
|
Cloud and identity |
Azure, Entra ID, Microsoft Purview |
|
DevOps |
Azure DevOps, GitHub, CI/CD pipelines |
Our Office 365 expertise covers the surrounding Microsoft 365 apps, and our DevOps consulting keeps releases repeatable.
How much does SharePoint solution development cost?
There are two separate budgets: licensing (what Microsoft charges per user) and development (what you pay to design and build the solution). People often plan for only one.
Microsoft licensing (per user, per month, billed annually)
SharePoint Online is now bought inside Microsoft 365 plans. Microsoft is retiring the standalone SharePoint Online Plan 1 and Plan 2 licences, so new buyers should plan around the bundles below. Prices reflect the July 2026 increase.
|
Microsoft 365 plan |
Approx. price per user/month |
Best for |
|
Business Basic |
US$7 (about ₹670) |
Small teams using web and mobile apps |
|
Business Standard |
US$14 (about ₹1,340) |
SMBs that need desktop Office apps |
|
Business Premium |
US$22 (about ₹2,110) |
SMBs that need advanced security |
|
Microsoft 365 E3 |
US$39 (about ₹3,740) |
Larger organisations; no 300-user cap |
|
Microsoft 365 E5 |
US$60 (about ₹5,760) |
Advanced security and compliance |
|
Copilot add-on |
US$30 (about ₹2,880) |
Teams adopting AI assistance |
Good to know: every tenant gets 1 TB of SharePoint storage plus 10 GB per licensed user, and extra storage is billed at about US$0.20 (₹19) per GB per month. Business plans are capped at 300 users. Always confirm current rates with Microsoft or your reseller, as regional pricing differs.
Development cost by solution type (industry ranges)
|
Solution |
Typical cost in USD |
Approx. cost in INR |
Timeline |
|
Team and communication site setup |
US3,000toUS8,000 |
₹2.9 to ₹7.7 lakh |
3 to 6 weeks |
|
Modern intranet (branding, news, custom web parts, search) |
US10,000toUS30,000 |
₹9.6 to ₹28.8 lakh |
8 to 14 weeks |
|
Document management system |
US12,000toUS35,000 |
₹11.5 to ₹33.6 lakh |
8 to 14 weeks |
|
Workflow automation (Power Apps and Power Automate) |
US5,000toUS25,000 |
₹4.8 to ₹24 lakh |
3 to 10 weeks |
|
Extranet or partner portal |
US15,000toUS45,000 |
₹14.4 to ₹43.2 lakh |
8 to 16 weeks |
|
Enterprise portal with ERP, CRM, HRMS integrations |
US40,000toUS100,000+ |
₹38.4 lakh to ₹96 lakh+ |
4 to 9 months |
|
Migration (small to mid-size) |
US3,000toUS15,000 |
₹2.9 to ₹14.4 lakh |
3 to 8 weeks |
|
Migration (large, multi-source) |
US25,000toUS100,000+ |
₹24 lakh to ₹96 lakh+ |
3 to 12 months |
|
AI add-on (RAG search, agents on SharePoint content) |
US8,000toUS40,000 |
₹7.7 to ₹38.4 lakh |
4 to 12 weeks |
These are market ranges for professionally delivered projects, not a fixed price list. Your quote depends on scope, integrations and data volume.
Typical hourly rates by region
|
Region |
Hourly rate (USD) |
Approx. hourly rate (INR) |
|
India |
US25toUS50 |
₹2,400 to ₹4,800 |
|
Eastern Europe |
US40toUS80 |
₹3,840 to ₹7,680 |
|
US, UK, Canada |
US100toUS200 |
₹9,600 to ₹19,200 |
Offshore delivery from India, as we do from Bangalore, is how many global businesses keep quality high and cost sensible. See our offshore software development model.
What drives the cost up or down
-
Number of sites, libraries and workflows
-
Custom SPFx development versus configuration and low-code
-
Number and complexity of integrations
-
Data volume and quality for migration
-
Security and compliance needs (audit trails, retention, data residency)
-
Design depth and the number of user roles
-
Training scope and number of locations
Costs people forget
-
Ongoing support: budget around 15 to 20% of build cost per year.
-
Training and change management: about 5 to 10% of project cost.
-
Premium add-ons: advanced Power Automate licences, third-party permission or migration tools.
-
Extra storage once you pass the tenant pool.
Ways to keep the budget under control
-
Reuse built-in SharePoint features before writing custom code.
-
Launch a focused first phase, then expand.
-
Clean content before migrating. Moving junk costs real money.
-
Fix governance early to avoid expensive rework.
-
Use a fixed-scope discovery phase to firm up the estimate.
SharePoint, AI and Copilot: what changes in 2026
AI assistants are only as good as the content they can read. A well-structured SharePoint, with clean metadata, correct permissions and current documents, is what makes Microsoft Copilot and custom AI tools useful instead of confusing. Two practical moves:
-
Tidy first. Archive stale files and fix oversharing before enabling AI features.
-
Add intelligence where it pays. Search across your libraries with a retrieval-augmented generation (RAG) layer, or build task-focused AI agents that answer HR or IT questions from your own documents.
If you are not sure where to begin, our AI consulting services and AI development and integration teams can map the opportunities.
Case study: SharePoint intranet for a leading aviation product manufacturer
The client. A global manufacturer of aviation components and systems, supplying commercial airlines, defence organisations and aerospace companies.
The challenge. As operations grew across departments, the company needed one internal platform for communication, IT support, HR processes and collaboration.
What we built. An internal application and team site on the Microsoft .NET framework and SharePoint platform, integrated with Microsoft Project Server for project management and resource allocation. The solution included:
-
A central team site for collaboration and document sharing
-
An IT support ticketing system
-
An HRMS portal for employee profiles, attendance, performance reviews and leave
-
A helpdesk for facilities, equipment and administrative requests
-
A company news and updates section
-
An organisation structure view
-
A process dashboard for KPIs and project progress
-
A company holiday and events calendar
The outcome. Teams collaborated better through one shared platform, the organisation structure became clear to employees at every level, and internal service requests were handled faster through the helpdesk.
Download the full case study (PDF) | See more Nextwebi case studies
Related reading: see how we approached process automation in our order management system case study for a construction material company.
All eight tools sit on one SharePoint and .NET platform, joined to Project Server for project and resource planning.
FAQ'S
Q.How long does it take to build a SharePoint solution?
Simple sites take 3 to 6 weeks, intranets and document systems 8 to 14 weeks, and complex enterprise portals 4 to 9 months.
Q.SharePoint Online or SharePoint Server: which should we pick?
Most businesses choose SharePoint Online for faster rollout, automatic updates and Teams and Copilot integration. Choose on-premises only for strict data residency or isolation requirements.
Q.Can SharePoint integrate with our ERP, CRM or HRMS?
Yes. SharePoint connects to business systems through APIs, Power Automate connectors and custom services, so data can flow both ways.
Q.Is SharePoint secure?
It can be very secure when configured well: role-based access, multi-factor authentication through Entra ID, sensitivity labels, retention policies and audit logs. Security depends on setup, so we recommend testing before launch.
Q.Do we need custom code, or is Power Apps enough?
For forms and approvals, low-code is often enough and cheaper. For custom interfaces, complex logic or heavy integrations, SPFx and .NET development are the better fit. Many solutions use both.
Q. Can you migrate us from SharePoint 2013, 2016 or 2019, or from file shares?
Yes. We assess your content, clean and map it, run a pilot and migrate in waves to limit downtime.
Q.Do you offer support after launch?
Yes. We provide ongoing maintenance, monitoring and enhancements, or you can add dedicated developers to your team.


